Shams Dubai · Grid-tied Solar · Dubai, UAE

Solar Energy
Installation
& Maintenance

Generate your own power at a fraction of the cost — and cut your DEWA bill for the next 25 years.

DEWA-eligible equipment only · One team owns your project · Conservative estimates
Savings Calculator

What would your kilowatt‑hour cost?

Move the slider to your average monthly DEWA bill. Estimates recalculate instantly, conservatively.

Solar panels and a wind turbine at sunset, self-generated clean power.
The direction of travelSelf-generated power
Your average monthly DEWA bill
3,000 AED / month
50020,000
Your price per kWh
vs 0.43 AED from DEWA, 75% cheaper
~0.11
Estimated savings
system sized to offset ~85% of your bill
22,900 AED/yr
Payback period
then the power is effectively yours
6.6 years
Get my full report on WhatsApp
Your phone number is the only required field
Pre-assessment estimate based on our published calculation methodology. Final numbers follow a free engineering assessment of your roof.
25-Year View

Keep paying DEWA — or stop

Keep paying DEWA Go solar
0 250k 500k 750k 1M Year 0 5 10 15 20 25 ≈ 525,000 AED kept break-even ≈ year 6 DEWA · ~900,000 AED Solar · ~375,000 AED
Illustrative model: a villa with a ~3,000 AED/month DEWA bill, on a grid-tied Shams Dubai system sized to offset ~85% of use — the same basis as the calculator above. Cumulative electricity cost over 25 years; tariff escalation assumed 0%.

Four reasons this holds up

From the DEWA filing to the numbers we publish, every SolTech system is backed by the same accountable standard.

Solar array beside wind turbines under the Shams Dubai grid programme.
01

Shams Dubai programme

Every system is designed and filed under DEWA's official grid-connection scheme.

A crew installing DEWA-eligible solar panels on a rooftop.
02

DEWA-eligible equipment only

We install only panels and inverters listed in DEWA's Eligible Equipment registry.

A SolTech engineer fitting a rooftop solar module.
03

In-house engineering

One team owns your project, your numbers and your warranty. No subcontractor roulette.

A villa rooftop solar array at sunset.
04

Open methodology

Every assumption behind our estimates is published. We calculate conservatively.

A SolTech crew installing rooftop solar panels at sunset, with the Dubai skyline behind.
Systems monitored
0
Why SolTech

Built by engineers, not salespeople

We size every system to your roof, your climate and your return — then stand behind the numbers with one accountable team from first calculation to year 25.

  • Engineered to your roofOrientation, shading and structure surveyed on site — not estimated from a photo.
  • One responsible partyThe same team owns the design, the DEWA filing, the install and the warranty.
  • Monitored from day oneRemote performance monitoring so a drop in output is caught before you'd ever notice it.
The Journey

From first calculation to 25 years of savings

01 · 2 MIN
Calculate
02 · ≤ 3 DAYS
Engineering assessment
03 · 24 H
Financial proposal
04 · FILED ≤ 5 DAYS
DEWA approval
05 · 2–7 DAYS
Installation
06 · DAY ONE
Monitoring
07 · ONGOING
25 years of savings
A typical villa goes live in 45–60 days end to end. Most of that is DEWA process time — what can extend it.
Model Scenarios

Two roofs, one logic

Modern villa with rooftop solar panels at sunset. Illustrative model
Villa · 12 kWp
Estimated production21,000 kWh / yr
Bill offset~85%
Payback~6 years
25-year net savings~180,000 AED
Large-scale solar array beside wind turbines. Illustrative model
Warehouse · 300 kWp
Estimated production525,000 kWh / yr
Project IRR~19%
Payback~4.5 years
25-year net savings~3.9M AED
Straight Answers

Questions people actually ask

Ready When You Are

The next 25 years of your power bill are being written now

A pre-calculation takes 24 hours. The engineering assessment is free.